Before any construction project can begin, there is one factor that every builder must be familiar with: local building codes. The City of Minneapolis issues building permits to ensure that all work is done in accordance with national and international standards so that the buildings where you work, live and play are safe.

Many commercial developers rely on the experience and knowledge of a licensed commercial contractor to help ensure that any building complies with Minneapolis building codes. Typically, a developer’s approach is to prepare the site for construction by installing road access, ensuring proper drainage, and inspecting. Whereas, the commercial contractor performs the construction and is therefore closely involved to ensure code compliance.

Some facts about the permit process in Minneapolis

1. The law requires licensed contractors for certain types of permit work. It is illegal to knowingly enter into a contract with an unlicensed contractor in these situations. Consult the Minneapolis Division of Licensing and Consumer Services at (612) 673-2080 for information on the specific situation.

2. You may be able to schedule an appointment for a business plan review with a business plan reviewer if your project meets certain requirements. Check with the Minneapolis Development Review at (612) 673-5839. If your business project has not yet reached the point where you are ready to apply for a permit, you can also schedule a preliminary business plan review.

3. Each permit type has unique licensing requirements. Many projects require more than one permit. Your commercial contractor should be able to help you determine what permits you need.

4. Minneapolis requires that when a contractor is used for commercial construction, the contractor obtain the permit on behalf of the developer.

5. Sometimes a site plan, zoning site review, and/or inspection plan review are required before a permit can be issued.

6. Each type of permit has its own fee and is based on the value of the work being performed.

7. You generally have one year from the date the permit was issued to complete exterior alterations, repairs, or remodeling. If you do not complete the work on time, you may be assessed a financial penalty. Permit extensions may be granted in accordance with the Minneapolis Code of Ordinances.

Remember, permits are only one aspect of making sure your commercial construction project is up to code. The inspection process is equally important. Your license minneapolis commercial contractor You must ensure that the project is completely ready before scheduling the inspection. The first inspection is covered by your permit fee, but additional inspections may be required depending on the project, so an additional fee may apply.

Because every project and every municipality is different, it is absolutely vital to be familiar with the steps required to bring your commercial building up to code. Always work with a licensed and experienced Minneapolis commercial contractor to save you money and headaches in the long run.